TRUSTEES OF THE COLORADO SCHOOL OF MINES
$46M in claimed savings from 4 terminated grants
Total grant value: $48M
Agencies involved: Department of Energy
Total Grants
4
Terminated by DOGE
Total Grant Value
$47.816M
Originally awarded
Total Claimed Savings
$45.998M
From terminations
Showing 4 of 4 grants
Terminated Grants
| Agency ↕️ | Grant Value ↕️ | Claimed Savings ↓ | Date ↕️ | Description | Link |
|---|---|---|---|---|---|
| Department of Energy | $32.672M | $32.402M | 10/2/2025 | BIPARTISAN INFRASTRUCTURE LAW - CARBONSAFE EOS: DEVELOPING COMMERCIAL SEQUESTRATION FOR SOUTHERN COLORADO THE SCOPE OF THE WORK INVOLVES IDENTIFYING THE MOST PROSPECTIVE INJECTION TARGET FORMATION IN TWO LOCATIONS WITHIN A SEQUESTRATION FAIRWAY AND ESTABLISHING STRONG STAKEHOLDER FOUNDATIONS FOR FUL | N/A |
| Department of Energy | $8.927M | $8.801M | 10/2/2025 | BIPARTISAN INFRASTRUCTURE LAW (BIL) - CTV III CO2 STORAGE PROJECT (CTV III) IN SACRAMENTO BASIN, CALIFORNIA THE PRIMARY OBJECTIVE OF THE COMMERCIAL CARBON TERRAVAULT III (CTV III) STORAGE STORAGE PROJECT PROJECT IS TO PROVIDE A SAFE, EFFECTIVE, AND COMMERCIAL-SCALE CARBON DIOXIDE COMMERCIAL-SCALE (C | N/A |
| Department of Energy | $3.011M | $2.471M | 10/2/2025 | THE OVERARCHING PROJECT OBJECTIVES ARE TO: •ADVANCE THE TRL OF P-SOECS FROM 3 TO 5, CONSIDERING NEW MATERIALS (ELECTROLYTE AND STEAM ELECTRODE) AND CELL ARCHITECTURES, •DEMONSTRATE THE ADVANTAGES OF P-SOECS COMPARED TO OTHER ELECTROLYSIS APPROACHES, •DEVELOP SCALABLE DESIGNS TO ENABLE ECONOMICALLY V | N/A |
| Department of Energy | $3.206M | $2.325M | 10/2/2025 | MITIGATING HYDROGEN LOSSES THROUGHOUT ALL STAGES OF TRANSFER OPERATIONS IS CRITICAL TO ENABLING LIQUID HYDROGEN (LH2) AS A HIGH USE AND HIGH-CAPACITY ENERGY STORAGE RESERVOIR, BOTH IN TERMS OF COST AND IN LIMITING THE ENVIRONMENTAL IMPACT OF HYDROGEN AS AN INDIRECT GREENHOUSE GAS. POINTS THROUGHOUT | N/A |